The cost of a Central Ground Water Authority (CGWA) permission for groundwater extraction is not a single, fixed fee. It is determined by several factors and includes two main components: an application fee and groundwater abstraction charges.
1. Application Fees
This is a one-time, non-refundable fee paid at the time of application. The amount of this fee can vary based on the specific guidelines in place and the category of the applicant. The fees are generally paid online through a government portal like Bharatkosh. While specific amounts can change, here is an example of the kind of fee structure that may exist:
• Fresh NOC Application: Around ₹10,000
• Renewal of NOC: Around ₹5,000
• Revival of NOC: Around ₹10,000 (if the NOC has expired)
2. Groundwater Abstraction/Restoration Charges
This is the main cost component and is calculated based on several key factors:
• Quantum of Water Abstraction: The more water you propose to withdraw, the higher the charges will be. The rates are typically structured in slabs based on the volume of water extracted per cubic meter (m3) or per thousand liters.
• Assessment Unit Category: The charges are significantly higher in areas that are classified as "over-exploited" or "critical" compared to "safe" or "semi-critical" areas. The CGWA and Central Ground Water Board (CGWB) regularly assess and update these classifications for all parts of the country.
• Type of Project: The rate of charges varies depending on the purpose of the water extraction. For example, the rates for a packaged drinking water unit or other high-use commercial activities are much higher than those for a residential housing society or an industrial unit.
• Groundwater Restoration Charges: In "over-exploited" areas, applicants may be required to pay an additional restoration charge to contribute to efforts to replenish the aquifer.
Exemptions
Certain categories of users are exempt from paying these fees and charges, including:
• Individual domestic consumers: For drinking and household use.
• Agriculture sector: In most cases, agricultural users are exempt from obtaining an NOC and paying fees, though this is a subject of ongoing policy discussions.
• Small and Micro Enterprises (SMEs): Those with a very low water requirement (typically less than 10 cubic meters per day) may be exempt from the application fee, late fees, and abstraction charges.
Other Potential Costs
In addition to the official government fees, an applicant may incur other costs, such as:
• Consultancy Fees: Hiring a professional hydro geologist or environmental consultant to prepare the detailed hydrogeological report, design the rainwater harvesting structures, and assist with the application process. This is a crucial and often substantial cost, especially for large-scale projects.
• Laboratory Testing Fees: For a certified groundwater quality report.
• Cost of implementing rainwater harvesting and recharge structures.
The Central Ground Water Authority (CGWA) has a streamlined online procedure for applying for a No Objection Certificate (NOC) for groundwater abstraction. The process, managed through the official "NOCAP" (NOC to Abstract Ground Water) portal, is designed to be comprehensive and transparent.
1. User Registration
• Access the Portal: The first step is to visit the official CGWA NOCAP portal
• New User Registration: Click on "New User Registration." You will be required to provide basic details such as your name, email ID, mobile number, and address.
• Verification: An OTP (One-Time Password) is sent to your registered mobile number for verification. After successful verification, you can create a unique username and password.
2. Application Submission
• Login: Log in to the portal using your newly created credentials.
• Select Application Type: From the menu, select the "New Application" option and choose the appropriate category for your project (e.g., Industrial, Infrastructure, or Mining).
• Fill the Application Form: The online form is extensive and requires detailed information about your project, including:
-- General Information: Name of the company/industry, location details (address, latitude, longitude), contact information, and project type.
-- Water Requirement Details: A breakdown of the total fresh water requirement, including water balance flow chart showing usage at each stage (e.g., domestic, industrial process, cooling, etc.).
-- Existing and Proposed Structures: Information on all existing and proposed bore wells/tube wells, including depth, diameter, and the installed pump horsepower.
-- Groundwater Conditions: A comprehensive report or note on the groundwater conditions of the area, especially for large-scale projects.
-- Rainwater Harvesting: Details of the proposed or existing rainwater harvesting and artificial recharge measures.
3. Document Upload
This is a critical step where you must upload all the required supporting documents in the specified formats (usually PDF or JPG). The documents vary based on the project type, but a general list includes:
• Proof of Land Ownership: Land registration deed, lease deed, or allotment letter.
• Statutory Approvals:
-- Valid Consent to Establish (CTE) or Consent to Operate (CTO) from the State Pollution Control Board (SPCB).
-- Environmental Clearance (EC) from the Ministry of Environment, Forest and Climate Change (MoEF&CC), if applicable.
-- Water Availability Proof: A certificate or affidavit of non-availability or partial availability of water from a government water supply agency.
-- Technical Reports:
-- A comprehensive hydrogeological report, especially for projects with high water withdrawal.
-- A detailed proposal for rainwater harvesting and artificial recharge.
-- In over-exploited areas, an Impact Assessment Report (IAR) with groundwater modeling may be required.
-- Corporate Documents: Certificate of Incorporation (CIN), Memorandum of Association (MOA), Articles of Association (AOA), and a board declaration authorizing the signatory.
-- Ground Watre Lab test Report: A groundwater quality test report from a NABL-accredited or government-approved lab.
4. Fee Payment and Submission
• Fee Calculation: The portal will calculate the application fee and the groundwater abstraction charges based on the details you have entered.
• Online Payment: Pay the fees online through the designated payment gateway. The application will not be processed until the fee is successfully paid.
• Final Submission: After uploading all documents and making the payment, review the entire application carefully. Once you are certain everything is correct, click "Submit."
Note: Once submitted, the application cannot be edited.
The CGWA permission for ground water abstraction is required for following purposes:
- Industrial Use/domestic usage in a factory
- Infrastructural Use
- Mining use
The documents required for a Central Ground Water Authority (CGWA) online application for a No Objection Certificate (NOC) vary depending on the type of project (industrial, infrastructure, or mining) and the amount of groundwater to be abstracted.
Documents Required for CGWA Online Application
1. Basic Project & Ownership Documents
• Proof of land ownership / lease agreement (sale deed, lease deed, allotment letter, etc.).
• Site plan / location map with geo-coordinates (Google map or survey map).
• Company registration documents (CIN, GST, PAN, MSME certificate if applicable).
2. Water Requirement Details
• Detailed water requirement report (process, domestic, cooling, green belt, etc.).
• Water balance chart (showing source, consumption, and disposal).
• Details of water meters proposed/installed (for monitoring extraction).
3. Hydrogeological & Technical Reports
• Hydrogeological report (by CGWA/State-approved geologist/hydrogeologist).
• Groundwater availability assessment (with test bore/observation well data).
• Rainwater harvesting / recharge proposal (with technical drawings).
4. Regulatory Clearances
• Consent to Establish / Operate (CTE/CTO) from State Pollution Control Board (or proof of having applied).
• Environmental Clearance (EC), if applicable.
• Approval/permission from local authority / industrial development authority (in case of industrial areas).
5. Compliance & Undertakings
• Self-declaration / Affidavit (on non-judicial stamp paper) confirming compliance with CGWA guidelines.
• Certificate of non-extraction (if the project is in a notified/restricted area and using alternate sources).
• Previous NOC and compliance report (for renewal applications).
6. Category-Specific Documents
• For Infrastructure projects (housing, hotels, hospitals, schools): Occupancy certificate/building plan approval.
• For Packaged Drinking Water Plants: BIS certification / application.
• For Mining Projects: Mining lease document and dewatering plan.
1. Andaman and Nicobar Islands
2. Assam
3. Arunachal Pradesh
4. Bihar
5. Chhattisgarh
6. Dadra and Nagar Haveli and Daman and Diu
7. Gujarat
8. Jharkhand
9. Madhya Pradesh
10. Maharashtra
11. Manipur
12. Meghalaya
13. Mizoram
14. Nagaland
15. Odisha
16. Rajasthan
17. Sikkim
18. Tripura
19. Uttarakhand
20. Andhra Pradesh (only mining projects)
21. Telangana (only mining projects)
The Central Ground Water Authority (CGWA) is a body established under the Environment (Protection) Act, 1986, with the primary mandate of regulating, managing, and controlling the development and management of India's groundwater resources. It operates under the Ministry of Jal Shakti.
Mission and Purpose of CGWA
• Sustainable Management: The core objective is to ensure the sustainable and responsible use of groundwater, a finite and critical resource.
• Preventing Over-exploitation: The CGWA aims to prevent the over-extraction of groundwater, which can lead to a decline in water tables, aquifer depletion, and water quality degradation.
• Conservation and Recharge: The authority promotes measures for groundwater conservation, such as rainwater harvesting and artificial recharge, and often makes them mandatory for entities that extract groundwater.
Regulatory Framework of CGWA
The CGWA has framed guidelines for granting No Objection Certificates (NOCs) for groundwater abstraction. These guidelines are the primary tool for regulating groundwater use. The application for an NOC is typically a detailed process that requires applicants to submit:
• A comprehensive hydrogeological report.
• Plans for rainwater harvesting and artificial recharge.
• A water quality report.
• Detailed information about the proposed water use.
Jurisdiction and Powers of CGWA
• Notified Areas: The CGWA has the power to notify specific areas as "over-exploited," "critical," or "semi-critical" based on the level of groundwater development. In these notified areas, restrictions on new bore wells and the quantity of water extraction are much stricter.
• Enforcement: The CGWA can take legal action against any entity found to be illegally extracting groundwater.
The Central Ground Water Authority (CGWA) is a statutory body established in India under the Environment (Protection) Act, 1986. It was formed to address the critical issue of groundwater depletion and contamination by regulating and controlling groundwater use across the country.
Functions of CGWA
The key functions of the CGWA are centered around the sustainable management and regulation of India's groundwater resources.
• Regulation of Groundwater Extraction: A primary function is to regulate and control groundwater abstraction. The CGWA issues No Objection Certificates (NOCs) for groundwater withdrawal to various entities, including industries, infrastructure projects, and mining operations. This ensures that groundwater use is within sustainable limits and does not lead to over-exploitation.
• Assessment and Monitoring: In collaboration with the Central Ground Water Board (CGWB), the CGWA monitors groundwater levels and quality nationwide. This involves collecting and analyzing hydrogeological data to assess the status of aquifers and identify areas that are "over-exploited" or "critical."
• Promoting Conservation: The authority actively promotes groundwater conservation by mandating and encouraging practices like rainwater harvesting and artificial recharge of aquifers, often making them a condition for granting NOCs.
• Advising Government Bodies: The CGWA provides technical and policy advice to central and state governments on all matters related to groundwater management, including the formulation of legislative measures and regulatory frameworks.
• Raising Awareness: It conducts awareness campaigns and workshops to educate the public, industries, and other stakeholders about the importance of groundwater conservation and sustainable water use.
Powers of CGWA
The CGWA is vested with significant powers to effectively carry out its functions and enforce compliance.
• Legal Authority: The CGWA is empowered to exercise the powers conferred upon it by the Environment (Protection) Act, 1986. This includes the authority to issue directions and take measures to prevent and control groundwater pollution and over-extraction.
• Enforcement and Penalties: It can enforce the penal provisions of the Act, which means it can impose fines and initiate legal action against individuals or organizations found violating groundwater regulations. This includes the power to seal illegal bore wells and penalize those who extract groundwater without a valid NOC.
• Notifying Areas: The authority has the power to notify specific areas as "over-exploited," "critical," or "semi-critical" based on groundwater assessment. Once an area is notified, stringent regulations and controls on groundwater extraction are put in place to manage the resource effectively.
• Setting Guidelines: The CGWA establishes guidelines and procedures for the grant of NOCs for groundwater withdrawal, which are revised periodically to reflect changing conditions and conservation needs. These guidelines specify the required documentation, fees, and conditions for approval.
The Central Ground Water Authority (CGWA) is a statutory body established by the Government of India under the Environment (Protection) Act, 1986. Its primary objective is to regulate, control, and manage the country's vast groundwater resources to ensure their sustainable use and prevent over-exploitation.
The CGWA was constituted in response to a directive from the Supreme Court of India to address the critical issue of groundwater depletion and contamination. It operates under the Ministry of Jal Shakti.
Key Functions and Responsibilities of the CGWA:
• Regulation and Control: The most important function of the CGWA is to regulate groundwater extraction, especially in areas that are over-exploited or designated as critical. It issues No Objection Certificates (NOCs) for groundwater withdrawal to industries, infrastructure projects, mining operations, and other entities to ensure that extraction is within sustainable limits.
• Enforcement: The authority has the power to take legal action against individuals and organizations that violate groundwater regulations. This includes imposing fines and shutting down illegal bore wells.
• Assessment and Monitoring: The CGWA works closely with the Central Ground Water Board (CGWB) to conduct hydrogeological surveys, monitor groundwater levels and quality through a network of observation wells, and assess the status of aquifers across the country.
• Promotion & Conservation: The CGWA actively promotes water conservation practices such as rainwater harvesting and artificial recharge of groundwater. It often makes these practices a mandatory condition for granting an NOC.
• Policy Formulation: It provides technical and policy-level advice to the central and state governments on issues related to groundwater management. This includes developing guidelines and strategies for sustainable use.
The Government fee for application for Hazardous Waste Authorization is generally NIL or Rs.10,000 and may depend on the State Pollution Control Board. If an agency is hired for the same, it may charge you. Metacorp charges Rs.10,000 as consulting fee for the end to end delivery of Hazardous Waste Authorization.
Code Characteristics
H1 Explosive
An explosive substance is a waste, whether solid or liquid and is likely to produce gas by any chemical reaction generating temperature and pressure which may be harmful for the individuals or environment .
H 3 Flammable liquids
Flammable liquids are liquids, or mixtures of liquids, such as paints, varnishes, lacquers, which produce a flammable vapor at temperatures of 60º C.
H 4.1 Flammable solids
Solids, or waste solids, other than those classed as explosives, which may be readily combustible, or may cause fire through friction, during its transportation.
H 4.2 Substances or wastes liable to spontaneous combustion
Substances or wastes which are known for spontaneous heating even at room temperature during the transport, or for heating by coming in contact with air resulting in fire.
H 4.3 Substances or wastes which, in contact with water emit flammable gases
Substances or wastes which, may become spontaneously flammable or produce flammable gases in dangerous quantities.
H 5.1 Oxidizing
Substances or wastes which are not combustible themselves but may contribute to the combustion or other materials by yielding oxygen.
H 5.2 Organic Peroxides
Organic substances or wastes which contain the bivalent-o-o-structure are thermally unstable substances which may undergo exothermic self-accelerating decomposition.
H 6.1 Poisons
Substances or wastes which may cause death or serious injury or harm the human health if swallowed or inhaled or by skin contact.
H 6.2 Infectious substances
Substances or wastes containing viable micro-organisms or their toxins which are known or suspected to cause disease in animals or humans.
H 8 Corrosives
Substances or wastes which, by chemical action, will cause severe damage when in contact with living tissue, or, in the case of leakage, will materially damage, or even destroy, other goods or the means of transport; they may also cause other hazards.
H 10 Liberation of toxic gases in contact with air or water
Substances or wastes which, by interaction with air or water, are liable to give off toxic gases in dangerous quantities.
H 11 Toxic (delayed or chronic)
Substances or wastes which, if they are inhaled or ingested or if they penetrate the skin, may involve delayed or chronic effects, including carcinogenicity).
H 12 Eco-toxic
Substances or wastes which if released, present or may present immediate or delayed adverse impacts to the environment by means of bioaccumulation or toxic effects upon biotic systems or both.
1. Aadhar Card and Pan card of Authorized Person
2. CIN certificate for Private/Limited Company
3. GST Certificate
4. Consent to Operate (CTO) (Issued by the Pollution Control Authority)\
5. Hazardous Waste Collection Agreement, with an SPCB Authorized recycler
6. Rent Agreement/proof of ownership
7. Detailed Project Report (DPR)
8. Layout Plan/Naksha
- Waste arising from a factory/manufacturing process in the form of effluents and emissions and containing physical, chemical, biological, reactive, toxic, flammable, explosive and corrosive materials which could cause danger or likely to cause danger to health or environment, is called as hazardous waste. Any individual or a business entity engaged in the Generation, Collection, Storage, Transportation, Reception, Reuse, Recycling, Recovery, Pre-processing, Co-processing, Utilizations, Treatment, Disposal and Incineration of Hazardous materials is required to apply for an Authorization certificate from the respective State Pollution Board or Pollution Control Committee.
- Hazardous and Other Wastes (Management and Trans-boundary Movement) Rules, 2016 Rules have been notified for the management of hazardous and other wastes.
The cost of obtaining a Pollution Control Registration from the Uttar Pradesh Pollution Control Board (UPPCB) is not a fixed amount. The cost of Pollution Control Registration (Consent to Establish-CTE/Consent to Operate-CTO) from the Uttar Pradesh Pollution Control Board (UPPCB) varies depending on factors such as the capital investment in the project.
• Fees are categorized based on the Capital investment in land, building, plant &machinery.
• For smaller projects (up to Rs.5 lakh capital investment) the fees are relatively low starting around Rs.100 to Rs.500 for CTE and Rs.200 to Rs.1000 for CTO.
• Industries are categorized by pollution potential, for White activity, no Fees, no consent required, CTE & CTO required for Green, Orange , Blue & Red Categories, with Red industries facing the highest fees.
• The authorization fee typically covers a validity period ranging between 5 to 10 years depending on the industry Category.
• The applicant must also budget for fees related to inspection document processing and any penalties imposed.
The procedure for online application for the Uttar Pradesh Pollution Control Registration (CTE/CTO) involves several specific steps on the official portals such as Nivesh Mitra and the OCMMS portal.
• Register as a new user with personal industry and contact information to generate login Credentials.
• Log in using your registered credentials and fill out the common Application form for the chosen unit.
• Upload or submit all requisite supporting documents, including cover letter, site plan, Land use certificate, project report, water/air pollution management scheme and other documents per the category.
• Pay the prescribed application fee online using the portal’s payment gateway.
• Categorization: Determine your industry Category (Red, Orange, Blue,Green or White) based on its pollution index.
• Documentation: Gather all the necessary documents such as proof of business registration land documents, a detailed project report, Layout plans and proposals for pollution control measures (ETP/STP/ APCD devices)
1. Lifetime Authorization for import and trading of Iron, Copper & Aluminium Scrap
2. E-waste EPR (for manufacturers and recyclers of E-waste)
3. Battery Waste EPR (For manufacturers & recyclers of battery waste)
4. Bio-Medical Waste Authorization
5. Solid Waste Management Authorization
6. Construction and Demolition Waste Authorization
7. Hazardous Waste Authorization or Scrap Dealer Certificate
8. Plastic Waste EPR (For manufacturers, Brand Owners & plastic Recyclers)
The validity of Consent to Operate (CTO) from the Uttar Pradesh Pollution Control Board (UPPCB) depends entirely on the category of the industry. The Validity of Consent to Operate (CTO) in Uttar Pradesh depends on the Category of the Industry:
• Red Category industries, the CTO is valid for 5 years
• Orange Category industries, the CTO is valid for 10 years
• Blue Category industries, the CTO is valid for 10 years
• Green Category industries, the CTO is valid for 15 years
• White Category industries do not require a CTO
Factories must apply for renewal of the CTO, 90 days before it's expiry, to ensure continuous & smooth operations.
The CTE registration is for one year or for completion of work, whichever is earlier are issued by Uttar Pradesh Pollution Control Board (UPPCB). From UPPCB, the extension can also be availed for valid reasons.
The documents required for CTE (Consent to Establish) application generally include a mix of proofs of possession, project and process details, technical plans and compliance certificates, as outlined by multiple State Pollution Control Boards in India.
• Authorized Person Pan Card
• Aadhar Card
• Authorization Letter
• Layout Plan
• CA Letter for total project cost
• Project Report (including production Capacity and Manufacturing process)
• DG Set Details
• Proof of Land Ownership/Lease Agreement
• NOC/Permission from local Authorities (Gram Panchayat, Municipality or Industrial Development Authority)
Pollution Board Registration is required for the construction of Premises (Land) or Installation of machinery (constructed premises). Application of other licenses which include
• Application for Liquor Registration
• Application for Health Trade Registration
• Application for Department of Tourism
• Application for new electricity connection
• Application for Boring NOC
• Application for Eating House
• Application for Factory Act Registration
The Uttar Pradesh Pollution Control Board (UPPCB) categorizes industrial units based on their Pollution Index (PI), which is a score that reflects their potential to cause pollution. This classification system is harmonized with the Central Pollution Control Board (CPCB), assisting the UPPCB to regulate industries, determine the validity of their consent certificates, and prioritize inspections. In Uttar Pradesh, the Industrial units are categorized by the Uttar Pradesh Pollution Board (UPPCB) based on their pollution potential into the following main categories:
• Red Category- These are the highest polluting units in this category & are subject to site-inspection at least once every 5 years to ensure compliance with pollution norms
• Orange Category- Industries with a pollution index score between 41 and 59 come in this category
• Green Category-These industries have a relatively low pollution potential index (PI)between 21 and 40, while less polluting, these are still required to adhere to environmental norms
. Blue Category - Some of the waste management/waste recycling business activities
• White Category- This Category was introduced for industries that are considered practically non-polluting within a pollution index (PI) of 20 or less. These industries do not require a Consent to Establish (CTE) or Consent to Operate (CTO)
1. Lifetime Authorization for import and trading of Iron, Copper & Aluminium Scrap
2. E-waste EPR (for manufacturers and recyclers of E-waste)
3. Battery Waste EPR (For manufacturers & recyclers of battery waste)
4. Bio-Medical Waste Authorization
5. Solid Waste Management Authorization
6. Construction and Demolition Waste Authorization
7. Hazardous Waste Authorization or Scrap Dealer Certificate
.8. Plastic Waste EPR (For manufacturers, Brand Owners & plastic Recyclers)
For the green and Orange categories, the Government fee depends on a letter issued by the Chartered Accountant, stating the total project cost of the business, and the cost incurred in setting up a business enterprise. The laboratory testing fee ranges between Rs.5,000 to Rs.10,000 for Boiler, Oil and Grease Trap, Effluent Treatment Plant (ETP) or Sewage Treatment Plant (STP).
The procedure for an online application for a Rajasthan Pollution Control Registration is a streamlined process primarily conducted through the state's online portals. The process is designed to be user-friendly, transparent, and efficient.
The entire process, from initial registration to the final certificate issuance, is managed online through the Raj Nivesh or Rajasthan Single Sign-On (SSO) portal.
Login and Registration
1. Access the Portal: Navigate to the official Raj Nivesh portal or the Rajasthan SSO portal.
2. Login: Use your existing Rajasthan SSO ID to log in.
3. New User Registration: If you are a new applicant, you will need to register your establishment or industrial unit through the portal. This is a one-time activity. The system will create a unique ID for your unit.
Select the Application Type
1. After logging in, go to the "Applications" or "Online Services" section.
2. From the list of services offered by the Rajasthan State Pollution Control Board, select the appropriate application type:
-- Consent to Establish (CTE): For new industries or projects before construction.
-- Consent to Operate (CTO): For established industries that are ready to commence operations or for renewal of an existing certificate.
-- You will also need to specify if the application is for the Water Act, Air Act, or both.
Upload Required Documents
The portal will provide a checklist of the documents you need to upload. All documents must be scanned and uploaded in the specified format (usually PDF). Common documents include:
-- Proof of land ownership or lease agreement.
-- Detailed Project Report (DPR).
-- Certificate of capital investment from a Chartered Accountant (CA).
-- Site and layout plans.
-- Copies of PAN and Aadhar Card of the proprietor/directors.
-- Environmental Clearance (EC), if applicable.
-- Consent fee receipt (after online payment).
Pay the Application Fee
-- The application fee is automatically calculated by the system based on your project's capital investment and industry category.
-- You can pay the fee online through the Rajasthan Payment Platform using various modes like net banking, debit/credit cards, or e-wallets.
-- An option for offline payment via bank challan is also available.
The Rajasthan Pollution Control Board (RSPCB) Registration is mandatory for any activity, industry, or facility in Rajasthan that has the potential to pollute air, water, or land or generates waste (solid, hazardous, biomedical, e-waste, plastic, etc.). This is a legal requirement under the Water (Prevention and Control of Pollution) Act, 1974, and the Air (Prevention and Control of Pollution) Act, 1981.
1. Industrial & Manufacturing Units
Any unit engaged in manufacturing, processing, or assembling needs RSPCB consent. Examples:
-- Large-scale industries: Cement plants, textile dyeing & printing, chemical, paper mills, tanneries, steel, sugar, pharmaceuticals.
-- Medium/small units: Food processing, packaging, paint, detergent, plastic manufacturing, electroplating.
-- Stone crushers, brick kilns, distilleries, foundries, workshops.
2. Healthcare Facilities
All facilities generating biomedical waste, such as:
-- Hospitals, nursing homes, clinics, veterinary hospitals.
-- Pathology labs, blood banks, diagnostic centers, dental clinics.
3. Hotels, Restaurants, and Resorts
-- Hotels, lodges, guest houses, banquet halls, resorts.
Needed because they generate sewage, solid waste, and sometimes hazardous waste.
The documents required for obtaining a CTE from the RPCB are:
- CIN Certificate
- MOA + AOA
- Company PAN Card
- GST Certificate
- Board Declaration for Authorized Person
- Lease Agreement
- RICO Rent NOC / Acknowledgement
- Electricity Bill
- Aadhaar Card & PAN Card of Authorized Person
- Site Plan
- Process Flow Chart
- CA letter for Total Project cost
The validity of a Rajasthan Pollution Control Board (RSPCB) Registration depends on the type of registration and the category of the industry. The RSPCB classifies industries based on their Pollution Index (PI), which determines the potential for environmental impact.
There are two main types of Registrations:
1. Consent to Establish (CTE): This is required before the establishment of any industrial project.
-- Validity: The CTE is generally valid for a period of 3 to 5 years.
-- Extension: If the project is not completed within this period, the applicant can request an extension. The request for an extension should be submitted before the expiry of the certificate.
2. Consent to Operate (CTO): This is required before the commencement of operations after the industry has been established. The validity of a CTO is directly linked to the industry's category.
-- Red Category: Industries with a high pollution potential (PI > 60) are granted a CTO with a validity of 5 years.
-- Orange Category: Industries with a medium pollution potential (PI between 41 and 59) are granted a CTO with a validity of 10 years.
--- Blue Category: Up to 10 years for CTO Consents
-- Green Category: Industries with a low pollution potential (PI between 21 and 40) are granted a CTO with a validity of 15 years.
-- White Category: Industries with a minimal pollution potential (PI < 20) are generally exempt from the consent mechanism and only need to notify the RSPCB.
For construction of the factory Premises (Land) or Installation of machinery (constructed premises)
Application of other registrations which include
- Application for new electricity connection
- Application for Factory Act Registration
- Application for Health Trade Registration
- Application for Eating House License / Police NOC
- Application for Department of Tourism
- Application for Ground Water Abstraction Permission
- Application for Liquor Registration
The Rajasthan Pollution Control Board (RSPCB) Registration is an official consent/authorization document issued by the RSPCB to industries, businesses, healthcare facilities, and other establishments in Rajasthan that may pollute air, water, or land.
It acts as a legal permit to operate in compliance with environmental laws & ensures that the unit follows pollution control norms laid down under the Water Act, 1974, Air Act, 1981, and the Environment Protection Act, 1986.
Types of Rajasthan Pollution Control Board Registrations
1. Consent to Establish (CTE)
-- Required before starting construction or installation of an industry, factory, or facility.
-- Ensures the project site, layout, and proposed pollution control measures comply with environmental standards.
2. Consent to Operate (CTO)
-- Required before starting operations/production.
-- Confirms that pollution control equipment (like Effluent Treatment Plants, Sewage Treatment Plants, Air Pollution Control Devices, etc.) are properly installed and functional.
-- Granted for a fixed period (varies by industry category).
3. Renewal of Consent
-- Industries must periodically renew their CTO.
-- Renewal period depends on the industry category:
-- Red Category (High pollution) – shorter validity (up to 5 years).
-- Orange Category (Medium pollution) – validity up to 10 years.
-- Green Category (Low pollution) – validity up to 15 years.
4. Other Authorizations (depending on activity)
-- Bio-Medical Waste Authorization (for hospitals, labs, clinics).
-- Hazardous Waste Authorization (for industries generating chemical/by-product waste).
-- Plastic Waste Authorization (for plastic producers, recyclers, brand owners).
-- E-Waste Authorization (for electronic manufacturers, dismantlers, recyclers).
1. Authorization for import and trading of Iron, Copper & Aluminium Scrap
2. E-waste EPR (for manufacturers and recyclers of E-waste)
3. Battery Waste EPR (For manufacturers & recyclers of battery waste)
4. Bio-Medical Waste Authorization
5. Solid Waste Management Authorization
6. Construction and Demolition Waste Authorization
7. Hazardous Waste Authorization or Scrap Dealer Certificate
8. Plastic Waste EPR (For manufacturers, Brand Owners & plastic Recyclers
The cost of a Haryana Pollution Control Registration varies significantly depending on what type of Registration you need.
Cost of Registration for Industries and Businesses
The cost of a Pollution Control Registration for an industry, such as the Consent to Establish (CTE) and Consent to Operate (CTO), is not a fixed amount. It is determined by a fee structure that depends on two main factors:
• Capital Investment: The primary factor is the total capital investment of the industrial unit on land, building, machinery, and equipment. The higher the investment, the higher the fee.
• Industry Category: The fee also depends on the industry's category as defined by the Haryana State Pollution Control Board (HSPCB) based on its pollution potential (Red, Orange, or Green).
Fee Structure (based on capital investment):
The HSPCB has a detailed schedule of fees. While the exact figures can be updated, here is a general breakdown to illustrate how the cost is structured:
• For Consent to Establish (CTE) & Consent to Operate (CTO):
-- Low Investment (e.g., up to ₹25 lakh): The fee is typically in the range of a few thousand rupees.
-- Medium Investment (e.g., ₹1 crore to ₹10 crore): The fees can range from tens of thousands of rupees.
-- High Investment (e.g., exceeding ₹100 crore): The fees can run into lakhs of rupees.
The fee for the "Consent to Operate" is often charged annually, while the "Consent to Establish" fee is a one-time charge valid for a specific period. The fee for subsequent years of the CTO is generally lower than the first-year fee.
Additional Costs
Beyond the application fee, a business may incur other costs:
• Consultant Fees: Many businesses hire environmental consultants to prepare the detailed project reports, design pollution control measures, and handle the application process, which adds to the overall cost.
• Bank Guarantee/Performance Security: For certain industries, especially those in the Red and Orange categories, the HSPCB may require a Bank Guarantee or performance security to ensure compliance with the stipulated conditions and implementation of pollution control measures. This is a refundable amount but requires upfront capital.
• Testing and Monitoring: Industries are also responsible for the cost of regular self-monitoring and testing of their emissions and effluents by an authorized laboratory, as required by the terms of their consent.